A 40 foot tower with a L-4 cab was constructed on the site in 1935 and replaced with a 40 foot pole tower with a L-4 cab in 1952. In 1971 a 40 foot tower with a live-in DNR cab was constructed on the site. The tower was dismantled and the cab moved to the town of Northport in 2013.